Fitting the Bridge
This bridge was much more warped than anticipated. Even after taking a plane to it, the fit to the top wasn’t ideal. The picture shows the bridge resting on the top, and a small gap between the bridge and the top. The bridge will be glued once this gap is removed, meaning the bridge must fit to the top with minimal or no pressure.